Hermetically sealed transformer selection

Select an oil-immersed transformer from the actual load, system voltage, installation environment and site interfaces—not from a model number alone. This guide helps prepare the transformer specification for a new installation or a replacement unit.

Hermetically sealed oil-immersed transformer prepared for engineering selection
01NEW INSTALLATION02REPLACEMENT UNIT03SYSTEM UPGRADE

Start with the project type

A new transformer and a replacement transformer begin with different information. Choose the path that matches the work on site.

01

New transformer specification

Define the transformer from the load schedule, system voltage, duty, installation conditions and project standards.

  • Load schedule and single-line diagram
  • Primary and secondary voltage
  • Duty cycle and installation environment
02

Replacement transformer

Match the electrical duty and physical interfaces of the existing unit, then review any operating problems or required upgrades.

  • Existing nameplate and test report
  • Outline, foundation and terminal position
  • Site photos and known operating issues
Oil-immersed transformers installed for industrial service

Transformer technical data required for selection

Complete data speeds up review, but an inquiry can start with the information already available.

01

Rated power and load profile

Required kVA, continuous or cyclic duty, starting current, overload and future load allowance.

02

Primary and secondary voltage

System voltage, output voltage, frequency, phase, vector group and permissible voltage variation.

03

Impedance and tapping

Required impedance, off-circuit or on-load tapping, tap range and regulation steps.

04

Ambient temperature and altitude

Maximum and minimum temperature, installation altitude, humidity, dust, salt mist and hazardous-area classification.

05

Installation and interfaces

Indoor or outdoor location, foundation, available space, cable or bus connection and terminal orientation.

06

Cooling and accessories

Cooling method, temperature indication, pressure protection, oil level monitoring and control-system contacts.

Hermetically sealed transformer for an industrial installation

When hermetically sealed construction is a good fit

A hermetically sealed transformer uses a sealed oil system to limit contact between insulating oil and the outside atmosphere. The construction is evaluated against the electrical duty, temperature rise, tank design and site environment—not selected by the name alone.

Sealed oil system

For projects that require controlled oil preservation without direct oil-to-atmosphere breathing.

Demanding environment

For indoor or outdoor service where moisture, dust, salt mist or access conditions affect equipment configuration.

Project-specific interfaces

For installations where dimensions, bushings, protection devices and control contacts must match the surrounding system.

Send the data you already have

You do not need a finished transformer specification to begin. Send the available electrical and site information; the missing selection data can then be confirmed in sequence.

Contact engineeringEngineering review for new, replacement and retrofit transformer projects.
  • 01Single-line diagram or system drawing
  • 02Load schedule and voltage data
  • 03Existing transformer nameplate
  • 04General arrangement or foundation drawing
  • 05Site and installation photographs
  • 06Project standards and accessory requirements

Common transformer selection questions

01

How is an oil-immersed transformer sized?

Sizing begins with the connected and operating load, duty pattern, starting current, diversity, expected growth and permissible temperature rise. Rated power should not be chosen from connected load alone.

02

What is needed for a replacement transformer?

At minimum, provide the existing nameplate, primary and secondary voltage, rated power, impedance, vector group, outline dimensions, foundation details and terminal positions. Site photos help confirm interfaces.

03

Can selection start without a complete data sheet?

Yes. A single-line diagram, nameplate, load list or site photograph is enough to start an engineering review. Missing parameters can be identified before a final specification is prepared.